Beyond Surveying and Engineering

In Person

R.A. Smith National, Inc. Knowledge Blog

Summer Construction Season in Full Swing: I-94 Freeway Closures Impact Local Street System

by John Bruggeman 6. June 2013 06:43

Recent construction work at the I-94 interchange and Rawson Avenue in southern Milwaukee County required full daytime and nighttime closures of the freeway system as part of the ongoing I-94 North-South project. Many motorists were detoured onto the local street system, utilizing arterials such as STH 241 (27th Street), STH 38 (Howell Avenue), STH 100 (Ryan Road), Drexel Avenue and College Avenue. These traffic impacts required signal timing modifications at several traffic signals along the detour routes to improve detour traffic flow. R.A. Smith National worked with the Wisconsin Department of Transportation to anticipate traffic problems at key intersections and made the necessary timing adjustments in advance of the closures. On a recent weekend freeway closure, staff monitored field conditions and made adjustments as traffic demands shifted throughout the duration of the closure. Additional overnight and weekend closures are anticipated throughout the summer. Drivers should stay tuned to local news and online resources such as 511wi.org for the latest roadway closure information.

Tags: , , , , ,

Traffic

Powered by BlogEngine.NET 2.0.0.36