| Project |
Description |
Year |
27th Street / STH 241 Corridor
Milwaukee County, Wis.
|
Conceptual design of 14 double- and triple-lane roundabouts along the 27th Street corridor in the Cities of Franklin and Oak Creek |
2009 |
USPS entrance intersection with College Avenue
Oak Creek, Wisconsin |
Design review for one single-lane roundabout |
2009 |
CTH J intersection with
CTH EB
Howard, Wisconsin |
Design review for one single-lane roundabout |
2009 |
| USH 53 intersection with WIS 35/George Street LaCrosse, Wisconsin |
Conceptual design and feasibility assessment for one multi-lane roundabout |
2009 |
CTH P / CTH PV
Washington County, Wis.
|
1 single lane design |
2006 - 2008 |
STH 145 Interchanges
with USH 41 & USH 45
Richfield, Wisconsin
|
System of 3, two-lane roundabouts and 2 single-lane roundabouts |
2006-2008 |
USH 41 / STH 441
Fox Valley, Wis.
|
Conceptual design of 39 single-, double-, and triple-lane roundabouts at interchanges on USH 41 and STH 441 |
2008-present |
CTH OO and CTH N Corridors
Little Chute, Wis.
|
System of 5, two-lane roundabouts |
2008 |
USH 12 / STH 23
Lake Delton, Wis.
|
1 two-lane design |
2007-2008 |
CTH P / I-94 Interchange
Waukesha County, Wis.
|
System of 1 single-lane roundabout, 1 two-lane roundabout, and 2 three-lane roundabouts | 2007 |
STH 26 Corridor
Watertown, Wis. |
9 single-lane designs (1 with 2 bypass lanes) and 1 two-lane design |
2006-present |
STH 60 Corridor, Slinger to Jackson, Wis.
|
5 multi-lane designs
(1 triple-lane entry) |
2005-present |
Grange Avenue / Southridge Mall Primary Access
Greendale, Wis.
|
1 two-lane design |
2007 |
CTH C / I-94 Interchange
Kenosha County, Wis.
|
System of 4 two-lane roundabouts |
2006-2007 |
CTH K / I-94 Interchange
Kenosha County, Wis.
|
System of 4 single-lane designs plus bypass lanes |
2006-2007 |
STH 60 / USH 41 Interchange
Slinger, Wis.
|
System of 3 two-lane roundabouts |
2006 |
STH 54 / I-43 Interchange
Green Bay, Wis. |
System of 2 multi-lane roundabouts (triple entries on each) |
2006 |
Breezewood Lane / Tular Road
Neenah, Wis.
|
Construction services on 1 single-lane roundabout |
2005 |
Racine Avenue / I-43 Interchange
Mukwonago, Wis.
|
System of 2 two-lane roundabouts |
2005-2006 |
WisDOT Design Reviews
|
18 single-lane designs |
2004-2006 |
STH 32 / Lake Drive
Bayside, Wis.
|
1 single-lane design |
2005 |
Chapman Farms Development
Mukwonago, Wis.
|
4 single-lane designs |
2005 |